分享这篇文章

3美元.300万年 悉尼轻轨 mass transportation project began in 2014 with mapped out goals to ease traffic congestion, allow travellers to navigate urban topography with ease and support the economic growth of the region.

Not only does the system provide direct connections to the Central Business District, 悉尼足球场, 悉尼板球场, Randwick赛马场, and the prestigious University of New South Wales, but it also encompasses pedestrian boulevards, 口袋公园, 公共艺术和雕塑, outdoor furniture and landscape designs.

Jensen Hughes Australia, (formally BCA Logic and MGAC), consulted on 可访问性, 通用设计, 消防与生命安全 专业知识, inspections and Crown Certification for this transformative project alongside Acciona and Aspect Studio Architects.

Prior to the light rail development, many of these destinations were supported by a dated public bus service, but now they are conveniently connected through this state-of-the-art rail system. The light rail trains now accommodate 450 passengers per trip, the equivalent of up to nine standard buses.

The resulting design created and opened access to outdoor spaces, 零售, 餐厅和无车走廊. One of the notable design challenges was creating efficient interchange points between light rail, 重轨, 和渡船, while folding in new connections points in the system.

Our scope of work included assessment and collation of fire safety certificates and issuance of a S109R BCA Completion Statement / Crown Certificate. We also consulted on the integration of fully accessible lifts and level access between trains and platforms, improved hearing loops and vision impaired functionality, accessible emergency help points, 便携式登机坡道. 除了, our team carried out routine inspections of construction development alongside written inspection reports, compliance advisement and clarifications.

We are proud to have helped this client achieve their customer promise of making sure all passengers have a safe, reliable and comfortable journey with a safe and clean environment accessible to all, a reliable and punctual service, easily accessible and accurate information and friendly and helpful customer service prepared to assist people of all abilities.

项目详细信息

项目所有者

新南威尔士州的交通

客户端

Acciona and Aspect Studio Architects

项目位置

澳大利亚悉尼

预计工程费用

$3.300万年

项目的规模

Over 24 km of Rail + Tunnel Infrastructure

彩宝网
运输及隧道

有特色的专家

艾伦·哈里曼

Vice President, Service Line Lead, 太平洋 Region

太平洋

Masters of Fire Applied Science, Fire Safety Design, Graduate Diploma in Building Surveying and Assessment, A1 (Unrestricted) Accredited Certifier, PCA & C10 Accredited Fire Safety Engineer

查看详细信息

詹森·休斯报道更多内容